One of the biggest concerns for clients undertaking a building project is not knowing what happens next. At Alan Bender Ltd, we've developed a clear and proven process that removes uncertainty and provides confidence at every stage. From your first enquiry through to final handover, our experienced team will guide you through design, approvals, pricing and construction, ensuring your project is carefully planned, professionally managed and delivered to the highest standard. The timeline below shows the typical journey from initial idea to completed project.
Initial Enquiry & Idea
You identify works are required, make a short description of what you would like done and set out your expectations of rough budget.
Estimated Time: 1–3 days
Contact & Initial Consultation
Speak with us, Phone Call / Email / Website Enquiry.
Talk to us about the scope of works, budget, and feasibility. We can then guide you in the right direction for your project requirements.
Initial Design Team Appointment
Meet with our in-house architect or we can recommend trusted designers. Here we understand your needs and set out the next steps based on your project.
Estimated Time: 1-2 weeks
Concept Design & layouts
Produce initial drawings which include floor plans and elevations with revisions based on your feedback.
Estimated Time: 2–4 weeks (project size dependant)
Planning Application (if required)
Submission to Local Authority Full Planning or apply for Lawful Development Certificate.
Council Determination Time: 8–10 weeks (May extend if revisions or conditions required)
Technical Design Stage
Produce building regulation drawings and work with structural engineers to confirm the final designs. Complete drainage, foundation and other specialist design if required.
Estimated Time: 4–6 weeks (project size dependant)
Building Regulations Approval
Submit the plans to be checked by Building Control, this could be via Local Authority or an Approved Inspector.
Estimated Time: 3–6 weeks (project size dependant)
Detailed Quotation
We arrange a site visit to discuss in detail your project, once we fully understand your requirements we provide a fixed quotation for the works. Always based on approved drawings and a clear scope with specific inclusions / exclusions.
Estimated Time: 1–2 weeks
Contract & Programme Agreed
Before works are scheduled and commence, we hold a deposit, sign contracts, produce a payment schedule, confirm the start and finish date.
Estimated Time: 1 week
Pre-Start Preparation
Set up phase, finalise any outstanding specification for specific products, Order materials, Appoint trades, complete health and safety documentation, neighbour notifications, and visit with your project manager and site supervisor.
Estimated Time: 1–4 weeks
Construction Phase
Build in accordance with the specification and building regulation drawings while following the project programme.
Typical durations (guide only): Kitchen or bathroom: 1–4 weeks Single storey extension or home renovation: 8–12 weeks Double storey extension: 12–18 weeks Bespoke new build 20-40 weeks
Building Control Inspections
Throughout the build we will organise all required inspections and make sure every aspect of the build is in line with the current regulations and is approved by building control.
Practical Completion & Handover
Project completion, all the final finishes are now installed any snagging items are addressed the site is cleaned.
Certification
Project signed off Building Control Completion Certificate, Electrical & Gas certificates, Structural warranties (if applicable) Estimated Time: 1–4 weeks after handover